From:                              route@monster.com

Sent:                               Tuesday, April 12, 2016 11:30 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: GIS Drafter

 

This resume has been forwarded to you at the request of Monster User xapeix03

Christopher Bunn 

Last updated:  11/30/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Yardley, PA  19067
US

Mobile: 215-964-8903   
Work:

cbunn149@yahoo.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Microstation v8i- autocadd 2015 drafter

Resume Value: cgxxdhd5wngr688q   

  

 

Christopher Bunnpage 1

CHRISTOPHER BUNN

1105 Gloria Lane ¨ Yardley, PA 19067 

H (215) 428-0430 ¨ cell (215) 964-8903 ¨ cbunn149@yahoo.com

___________________________________________________________________________________________

 

 

 

PROFESSIONAL EXPERIENCE:

 

Chilton Engineering, cherry Hill NJ

 

Senior Engineering Technician            Nov. 1st- present

I’m currently completing an InRoads project, creating DTMs, break lines and contours for a preliminary bridge project in Buck County PA. I’m also setting up an ITS project for the NYCDOT. The project entails 6 ITS signs along the belt parkway in Queens and Brooklyn. This project is being done in Autocad 2014. (this project has been put on hold)

 

 

Act Engineers Inc, Robbinsville NJ Sept. 13th- Dec 5th 2013

Rowbear Consulting – Red Bank NJ

 

AutoCad/Microstation Cad Drafter:

 

I worked in a dual role for both Act Engineers and Rowbear consulting out of the same office. For Act Engineers I worked assisting in Autocadd civil 3d creating plans for various projects. I also created an Autocadd to Microstation CVS file for their CAD conversion needs.

 

For Rowbear Consulting I updated environmental files for NJDOT’s RT280/RT 21 interchange project.

 

 

 

 

 

Orbital Engineering – Bensalem PAMay 8th – June 14th 2013

 

Electrical Microstation Cad Drafter:

I worked as part of a two person team to update 170 relined files for PSE&G. The project was done ahead of schedule and met the client’s satisfaction.

 

 

 

Maser Consulting – Hamilton NJMay 2012 – September 2012

 

Survey CAD Technician:

I converted raw survey data and existing GIS information into useable base maps for PSE&G project spanning from Athenia Switching Station to the Bergen Switching Station in Northern New Jersey. I used Etac maps to create parcel plans for the project. Another part of my job included creating 3-D utility files. I also convert the files from Autocad 2009 civil 3d LDD files into the finished product in Microstation v8i. Numerous line style modifications were needed, the shifting of the reference files were made to make the final product meet the client specifications. I have project management training along with knowledge of (M.A.G.I.C) customer relation skills.

 

 

 

 

 

 

 

 

Orth-Rodgers & Associates -, West Trenton, NJ:August 2006 to Oct 2010

 

DESIGNER I

Responsibilities included generating geometric designs for intersections, creating horizontal and vertical alignments and cross sections using InRoads. Other tasks also include creating traffic signing and pavement marking plans as well as construction staging and maintenance and protection of traffic plans using Microstation V8 and AUTOCADD civil 3d 2009. Utilizing Arc-View as well as other GIS related software/websites to find information such as wetlands, hazardous material/superfund sites and historical resources. Incorporating engineers marked up electrical and signal plans in accordance with NJDOT/PennDOT CADD standards. Experience also includes using visual lighting software to achieve lighting uniformity for streetscape lighting.

       Clients/Projects:

Earle Naval Weapons Station:

·   Earle Lauralwood Housing Access to RT 34 Colts Neck Township.

Wal-Mart Corporation:

·   Intersection upgrades for 4 new Wal-Mart sites

City of Philadelphia/PennDOT:

·   4 Streetscape projects.

NJDOT:

·   Various intersection/highway improvement projects for Ocean, Cape May, Monmouth, Ewing and Burlington Counties in NJ:

 

PennDOT district 1-0

·   Erie Bay front streetscapes project                                               

 

 

 

KCI Technologies, Bensalem, PA       

CAD Drafter August 1997 – August 2006

Responsibilities include: maintaining the office’s CADD/IT system; drafting, updating and plotting related maps and graphics using Microstation V8; creating traffic signal plans, pavement marking plans, detour routes, typical roadway sections, cross sections and profiles. Use of Arc-View and other GIS software to find wetland locations; calculating impacts for wetlands and stream impacts; collecting natural resource and hazardous waste site information for various proposals and projects; collecting right-of-way and tax parcel information for specific project plans in accordance with PennDOT CADD standards. Other responsibilities include monitoring traffic activities for various projects to construct electronic models of traffic patterns.

 

Clients/Projects:

Pennsylvania Turnpike Commission:

·   EIS and FEIS for the I-95/I-276 Interchange Project – Bensalem, Middletown and Bristol Townships.

 

PennDOT District 6-0:

·   Various PennDOT related projects.

 

SEPTA:

·   Cross-County Metro Corridor, Light Rail Study from Thorndale Township, Chester County to Morrisville Borough, Bucks County.

 

City of Philadelphia:

SR 2009 Harbison Ave. / Aramingo Ave. 26, Intersection Improvement Project; Bells Mill Road Improvement Project.

 

 

   Site Models, Woodbury, NJ

CAD drafter      June 1996 – August 1997

Responsibilities include: utilizing Microstation V7 and VEXCEL 3-D photogrammetric systems to create accurate 3-dimensional models in PDMS for clients.  Other responsibilities included performing site visits for field measurement to verify the accuracy during the modeling process.

 

Clients/Projects:

Merck Pharmaceuticals, Whitehouse Station, NJ Campus:

·   Created 3-D models to determine the feasibility of installing new equipment.

 

PSE&G:

·   Created highly accurate site models to assist PSE&G with the replacement of a 126’ steam generator at the Salem 1 nuclear power plant. The model was created to be within 1” for building steel surrounding the generator unit and within 1/4” for all piping. Models included all equipment, piping larger than 1”, valves, flanges and cable trays.

 

 

Jacobs Segal Triad, Narberth, PA

CAD drafter    August 1995 – June 1996

Responsibilities include: using AutoCAD 12 software and Microstation V5 to incorporate engineer’s mark-ups for various clients including Friends Hospital and Merck Pharmaceuticals for the installation for piping/plumbing systems for drainage and laboratory sinks and water supply.

 

 

Cataract, Inc., Newtown, PA

CAD drafter  November 1992 – August 1995

Responsibilities include: incorporating as-built drawings using Microstation V5 and IRAS-B software.

 

Clients/Projects:

PECO:

Limerick and Peach Bottom Nuclear Power Plants. 

·   Responsible for incorporating field markups (as-builts) for PECO’s two nuclear power stations as well as performing field verifications for their gas process/distribution plant 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMPUTER SKILLS:

Proficient in: MicrostationV8I, AUTOCADD 2009. Working knowledge in, civil LDD,Inroads, Microsoft Office Suite, GIS Mapping ,VEXCEL and 3-D photogrammetric programs, IRAS-B, PDMS

 

 

EDUCATION: 

Davenport University of Business, Grand Rapids, MI

Bucks County Community College, Business Management

 

 

 

 

 

 

 

 

 

 

INTERESTS & AFFILIATIONS

 

Life Member of the Yardley-Makefield Volunteer Fire Company, (1982 – Present)

Leadership positions:

·               Assistant Chief: Oversaw daily operation of fire station; implemented and oversaw training exercises; mentoring junior firefighters and new recruits; ensured that all safety protocols and policies were implemented and followed; Oversaw fire safety during a Presidential visit to Lower Makefield Township in 2004 and worked with various members of the U.S. Secret Service, PA state and local police for several weeks to ensure to safe arrival and departure of the President of the United States.

·               I was on the plan review committee to review any new developments and commercial buildings to ensure they met local and state codes.

·               Trustee: responsible for oversight of entire fire company; adherence to rules, regulations and policies implemented by department were carried out; investigated any complaints or violations and brought to resolution;

·               Trustee for Relief Association: ensured strict adherence to the PA State purchasing guidelines; responsible for financial records of Relief Association; purchase and disposal of certain equipment covered under State guidelines; oversaw 7 million dollars of relief money;

·               New Fire truck committee: responsible for purchasing approximately 2 million dollars worth of equipment; spec out new fire trucks and seek approval from township for purchase; visits to truck manufacturing plant at different intervals during the assembly of the truck

·               Drivers Training Committee: responsible for training new drivers and gage their proficiency on different apparatus; maintaining records of all drivers and their qualifications.

·               Planning committee for new office complexes and housing developments

 

Yardley-Makefield Emergency Unit (1984-1990)

Served as an EMT on Emergency related calls

 

 

 

PRIOR SECURITY CLEARANCES/BACKGROUND CHECKS;

FBI background check for unescorted access to St. Lucie Nuclear power plant

U.S. Secret service background check for presidential visit in 2004 

 

 

 

 

 

 

 

REFERENCES:  

 

Professional:

 

Joseph F. (Jay) Roth III, P.E.

Senior Program Manager /                    
Trevose Operations Manager

JACOBS NA Infrastructure – East
900 Northbrook Drive, Suite 300

Trevose, PA 19053

215-355-3577 Office
215-355-3147 Fax
jroth@jacobs.com

 

 

Marshall Robert

Rowbear Consulting, P.C.
527 Bangs Avenue, Suite 12
Asbury Park, NJ 07712

Phone 609-571-8381

MRobert@rowbertconsulting.com

 

Kristin M. Norwood, P.E.

Senior transportation engineer

Gilmore& Associates, Inc
65 E Butler Ave, Suite 100
New Britain, PA 18901
 

 

 

Personal:

 

Robert J. Snyder, P.L.S.
Principal - Manager of Survey Operations
KELLY & CLOSE
CONSULTING ENGINEERS & SURVEYORS
Phone: 610.358.9363 Ext 206
Fax: 610.358.9376
Cell: 215.480.9599

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Microstation- autocadd drafter

chilton enginners

- Present

 

Additional Info

BACK TO TOP

 

Desired Salary/Wage:

28.00 - 30.00 USD hr

Current Career Level:

Experienced (Non-Manager)

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Microstation- autocadd drafter

Desired Job Type:

Employee

Desired Status:

Full-Time
Part-Time
Per Diem

 

Target Company:

Company Size:

Industry:

Engineering Services

Occupation:

Sales/Retail/Business Development

·         Business Development/New Accounts

·         General/Other: Sales/Business Development

Customer Support/Client Care

·         Call Center

 

Target Locations:

Selected Locations:

US-PA-Philadelphia

Relocate:

No

Willingness to travel:

Up to 25% travel